Venice Works

 

our best works

mappa_venezia.png

 
via garibaldi giardini.jpg

Via Garibaldi, Giardini

First external intervention that saw the use of DRYFIT. Area subject to degradation and high waters. The use of DRYFIT has allowed a lasting restoration of the coverings and has increased the decorum of the area.
Work done in 2018, to date no problems found.


 
 
 
ghetto-venezia-sal-monfiore.jpg

Montefiore Hall, Ghetto

Work carried out on the external facades of the ground floor of the Monfiore hall.
The external plaster was then covered by a lime-based finish to uniform both the ground floor and the upper floor.

 
 

 
casa rossa del majno.jpg

Marcello Del Majno, exhibition space

Intervention carried out inside a storage warehouse that due to humidity was little used and enhanced.
After the application, the space was used to host works and valuable objects in view of the Art Biennale.
Intervention carried out in 2013.

In 2017, after the excellent results in the exhibition space, the entire ground floor of the red house so far abandoned is renovated. The intervention saw the use of DRYNEX to protect the walls and STILNEX in areas with lower risk of high water. The restoration was extremely effective, so much so that it emerged unscathed from the exceptional high waters of December 2019. The coatings have not undergone any type of degradation.

 
 

 
giardino-sammartini(comp).jpg

Balbi-Valier palace, courtyard

The first test for DRYNEX.
The first building sites at Palazzo Balbi-Valier are dated 2002. To date, this building represents the flagship and the most arduous test bench. No visible defect, restoration of previously unusable environments, reduction of the continuous costs of wall renovation, over 20 high waters per year at the lowest points (below street level) of application.

 
 

 
bagno-palazzo-balibi-valier-DRYNEX.jpg

Balbi-Valier palace, courtyard

First absolute intervention in Venice, back in 2002.
Bathroom below the street level of about 80 cm, subject to very strong capillary rises and salt crystallizations and about 20 high waters per year.
Plastered with DRYNEX

 
 

 
casa-delle-zattere-DRYNEX.jpg

Cicogna Palace, ground floor intervention

Intervention carried out in 2015 on the ground floor of an apartment of Casa Cicogna, a famous building built by the architect Ignazio Gardella


 
palazzo-canal-grande-drynex.jpg

Canal Grande, Palace

Intervention carried out outside a building on the Grand Canal at the church of S. Luca.
DRYNEX was applied in direct contact with the wave motion as seen in the photo.
Intervention carried out in 2015.


 
berlucchi-drynex.jpg

Arsenale building site

Intervention carried out both inside and outside.
The external plaster was laid in 2008, the internal intercom is from 2013.


 
giardini-esterno-drynex.jpg

External plastering in the “Guardini” Area

External intervention in the Giardini area.
The external plaster was laid in 2009, in a private home, the photo shown above is from 2016.